Foshan Biying's dental medical equipment environmental protection publicity
- 2018-10-23-

Foshan Biying Medical Equipment Co., Ltd.

Foshan Biying's dental medical equipment environmental protection publicity: According to the Environmental Protection Management Regulations of the Ministry of Environmental Protection, Foshan Biying Medical Equipment Co., Ltd. entrusted Guangdong Tongchuang Weiye Testing Technology Co., Ltd. to Foshan Biying Medical Equipment Co., Ltd. The company's relocation and expansion project (hereinafter referred to as the “project”) conducts inspection and acceptance monitoring, and organizes the environmental protection facilities completion acceptance meeting to pass the completion of environmental protection acceptance. In order to protect the public's right to participate in the environmental protection, the right to know and the supervision, according to the provisions of the General Office of the Ministry of Environmental Protection, "Guidelines for the disclosure of government information on environmental impact assessment of construction projects (Trial)" (Circular Office [2013] No. 103), etc. The environmental protection implementation of the project will be publicized, and the publicity period will be from April 20 to May 21, 2018. During the publicity period, the public can report problems in various forms such as calls, letters, visits, etc., and investigate, verify and deal with the public's reflections as one of the basis for environmental acceptance of the project completion.


Complaint call: 12369


Basic Information


Construction start date: October 2017


Completion date: March 20, 2018


Acceptance date: April 16, 2018


Project Name: Foshan Biying Medical Equipment Co., Ltd.


Construction site: No. 9 Beiyuan East Road, Shishan Town, Nanhai District, Foshan City


Construction unit: Foshan Biying Medical Equipment Co., Ltd.


Acceptance monitoring unit: Guangdong Tongchuang Weiye Testing Technology Co., Ltd.


I. Basic information of the project


Foshan Biying Medical Equipment Co., Ltd. is located at No. 9 Beiyuan East Road, Shishan Town, Nanhai District, Foshan City (center coordinates: 23°10'12.35′′N, 112°59′7.39′′E). The project is leased and built as a production plant, covering an area of ​​about 5,400 m2 and a construction area of ​​about 9,77.6.64 m2. The total investment of the project is 1.2 million yuan, including 50,000 yuan for environmental protection. The project plans to produce 260,000 high-speed and low-speed mobile phones per year.


The project started construction in October 2017, completed construction in March 2018, and was organized and accepted on April 16, 2018.



Second, the implementation of environmental protection


The project implementation environmental impact assessment system and the “three simultaneous” system fulfilled the environmental approval procedures and the environmental protection archives were complete.


(1) Exhaust gas treatment facilities


The metal dust is regularly cleaned and ventilated to maintain air circulation. After the sandblasting dust is collected, it is discharged in a non-organized form after being treated by a bag filter.


(2) Wastewater treatment facilities


The project wastewater is mainly domestic sewage. According to the engineering analysis, the project staff's domestic sewage discharge is 1512t/a, and the main pollutants are CODCr, BOD5, SS, NH3-N and so on. According to the drainage requirements of the Code for Design of Building Water Supply and Drainage (GB50015-2003), domestic sewage must be pretreated by a three-stage septic tank before being discharged into urban drainage pipes. According to the municipal public works, the project belongs to the sewage disposal area of ​​the Shishan Northwest Sewage Treatment Plant, and the sewage pipe has been connected. After the pre-treatment of the three-stage septic tank, the domestic sewage of the project will reach the third-grade standard of the second period of the “Water Pollutant Discharge Limit” (DB44/26-2001) of Guangdong Province and then be discharged into the Northwest Sewage Treatment Plant, which will be treated by the Northwest Sewage Treatment Plant. After reaching the first-level standard of the second period of the "Water Pollutant Discharge Limits" of Guangdong Province (DB44/26-2001) and the "Analysis of Pollutant Discharge Standards for Urban Sewage Treatment Plants" (GB18918-2002), the first-class A standard is more stringent. Into the southwest.


(3) Noise treatment facilities


The main noise of the project is the industrial noise generated during the operation of the equipment. By selecting low-noise equipment and reasonable installation, vibration and noise reduction treatment is adopted, noise sources are reasonably arranged, and operation at night is avoided. Planting measures are carried out around the project site to reduce noise. Environmental impact.


(4) Solid waste treatment and disposal


The project collects and collects domestic garbage through the classification and handing it over to the sanitation unit, which is in line with the “Measures for the Management of Municipal Domestic Waste”; the metal scrap generated during the processing of the project is collected and taken out to the recycling company for recycling; the cutting fluid is processed during the project machining process. Recycling, no efflux, due to evaporation loss during recycling, regular replenishment; waste cutting fluid tanks produced during the production process are collected and returned to the supplier for recycling.


(5) Environmental risk prevention measures


The company has formulated the Environmental Risk Emergency Plan for Foshan Biying Medical Equipment Co., Ltd.



Third, the acceptance monitoring results


The Acceptance Monitoring Report of the Relocation and Expansion Project of Foshan Biying Medical Equipment Co., Ltd. compiled by Guangdong Tongchuang Weiye Testing Technology Co., Ltd. (TCWY (3018) No. 0322008) indicates:


(1) Working condition


During the acceptance monitoring period, the project production load meets the acceptance monitoring conditions.


(2) Unorganized emissions


The project waste gas mainly comes from the metal dust generated by the machining process and the sandblasting dust generated by the sandblasting process. Metal dust particles are generated during the production process, and the monitoring results are in line with the “Air Pollutant Emission Limits” of Guangdong Province (DB44/27-2001). Standard limit requirements.


(3) Waste water


The project has no production wastewater discharge, and the project wastewater mainly comes from the domestic sewage of employees. The main pollutants are CODCr, BOD5, SS, NH3-N and so on. According to the municipal public works, the domestic sewage of the project is discharged into the Northwest Sewage Treatment Plant after being pretreated by the third-stage septic tank to reach the third-level standard of the second period of the “Water Pollutant Discharge Limit” (DB44/26-2001) of Guangdong Province. The Northwest Sewage Treatment Plant has reached the first-level standard of the second period of the “Water Pollutant Emission Limits” (DB44/26-2001) of Guangdong Province and the Level A Standard of the “Emission Standards for Pollutants in Urban Sewage Treatment Plants” (GB18918-2002). After the strict value, it is discharged into the southwest.


(4) Noise


All monitoring values ​​of environmental noise at the boundary of industrial enterprises meet the requirements of Class 2 standard limits of Environmental Noise Emission Standards for Industrial Enterprises (GB12348-2008), which are discharged to meet the standards.


(5) Public opinion survey


According to the EIA and EIA approval documents, the project does not require public opinion survey.


Fourth, the right to hearing


According to Article 47 of the Administrative Licensing Law of the People's Republic of China, if the environmental protection acceptance permit for completion of the project involves a significant interest relationship between the applicant (ie Foshan Biying Medical Equipment Co., Ltd.) and others, the applicant and the interests The person in charge has the right to apply for a hearing from the Foshan Environmental Protection Bureau. If you apply for a hearing, you should submit a hearing application to the Foshan Municipal Environmental Protection Bureau in writing within 20 days from the date of publication.





Foshan Biying Medical Equipment Co., Ltd.


April 20, 2018